正義國宅社區-屋頂防水

隔熱磚與壓層打除

Heat-insulating bricks and pressure layer removal.


與鄰戶交界處斷水處理

Water disconnection treatment at the junction with neighboring households.

地坪面清潔與凹陷處補強

Floor surface cleaning and depression reinforcement.

防水底漆的作業

The operation of waterproof primer.

抗裂網鋪貼施工

Anti-cracking mesh paving construction.

防水材施工作業

Waterproof material application work.

採用多重複合式防水工法

Multi-composite waterproofing method.

防水層完成淹水測漏7天

Waterproofing layer completed, flooding leak detection 7 days.

測漏正常後進行地磚鋪貼

Tiling after normal leak detection.

女兒牆防水塗佈,施工完成

parapet waterproof coating, project nearing completion.